Pricing Quoting and Formulas

At RHB Electrical Services one of our main Values is Integrity. Here below you can see the methods used to price work.

  • Pricing formula as of June 2025

    £320 per working day.

    £243 per short day

    £80 for small jobs

    Fault finding

    Due to the diverse and sometimes challenging world of fault-finding,. Fault finding is charged at £80 for the first hour, then £10 for every subsequent hour.

    EV Pre-Install Checklist and Risk Assessment

    The cost of this is £74.

    A Checklist is required to assess the current electrical installation for safety and maximum load, assess the risk associated with EV chargers, and determine the best method of installation. This also covers DNO applications and certification.

    Time + Parts

    Some clients who have ongoing and progressive work will benefit from a time-plus-materials basis. This will work out cheaper as it requires less administration and allows a degree of flexibility. This must be pre-established.

    Domestic Electrical Condition Reports (EICRS)

    The cost of this is £168, or £210 for more complex installs.

    Unquoted Work

    Occasionally work is completed (Usually at short notice) without initially giving a quote or fixed price. This is chargeable at £30 per Hour.

    NOTE: Existing and Legacy customers maybe charged alternatively or at rates similar to that which were previously specified.

    NOTE: RHBES is not a VAT-registered company and does not charge VAT on any of the prices above.

  • Utilising an understanding of the sector and good relations with Worcester's wholesalers and national internet merchants, the best value-for-money materials are sourced to be used. The price of specifically specified materials are sold at their purchasing value. However, an allowance for consumables and other sundries are charged as a percentage of the total material cost.

  • Generally speaking, all work is quoted. This means the price is legally fixed at a specific amount. Any additions or alterations that would increase the fixed amount would be notified prior to commencing said work.

    RHBES Quotations are itemized, materials and labour are listed separately.

    When requested or larger jobs, an initial estimate can be given to give a rough idea of costing.